Oljedirektoratet

Researcher Geir Evensen wins the award for improved oil recovery

Geir Evensen-Ingrid Solberg-SH-1920-1080

01/09/2020 The Norwegian Petroleum Directorate (NPD) is presentings its 16th award for improved oil recovery. This time the IOR award goes to researcher Geir Evensen at the research institute NORCE.

General director Ingrid Sølvberg presented the award in conjunction with ONS Digital.

The two other finalists were the Grane field in the North Sea and oil company Lundin.

Evensen has made significant contributions over a number years toward the development of modelling methods based on the ensemble approach. This technology is used extensively among the oil and gas companies on the Norwegian shelf.

“It's my immense pleasure to present you with the Norwegian Petroleum Directorate's IOR award 2020, Geir Evensen! The method you have developed leads to a better basis for making decisions, and thereby improved value creation”, Ingrid Sølvberg said when she presented the award.

“We are very concerned with value creation. More profitable production from fields leads to increased revenues for the treasury”, she added.

Important award and deserving winner

It has become a tradition for the NPD to present an award for oil recovery every other year;, the first time was in 1998.

“The IOR award is an important award, both for us in the NPD and for the industry. Being a driving force for recovering all profitable resources in the fields on the shelf is an important task for us”, Sølvberg says.

24 nominations were submitted to the jury. The jury is composed of 7 representatives from different disciplines in the NPD, who have done a thorough evaluation job.

Better description of reservoirs

Award winner Evensen invented the Ensemble Kalman Filter (EnKF) algorithm in 1994, which has subsequently been further developed and used by several international oil companies. In the 2000s, he led the work to implement this model in Equinor.

“The method, which in Equinor is called FMU (Fast Model Update), is a workflow for reservoir modelling where we use a number of models in parallel to describe the reservoir’s uncertainty”, Evensen explains.

“We can also quickly update the reservoir models based on observed data. This gives us a better description of the reservoir’s associated uncertainties, which is useful in the placement of wells and the development of drainage strategies”.

Extending the lifetime of wells and fields

Improved oil recovery is not merely a focus on the oil and gas that's easiest to produce. It is also about companies that are willing to go the extra mile – beyond what's in their plans – to produce all oil and gas that is profitable for society.

The most important measures to increase recovery on Norwegian fields have proven to be the drilling of additional wells, injecting water, gas or a combination of these to maintain pressure in the reservoir, as well as various measures to extend the lifetime of wells and fields.

The fields on the Norwegian shelf have an average recovery rate of approx. 48 per cent. Some have more, others have less. This is a very high recovery rate compared with most petroleum provinces around the world, but this also means that a bit more than half of the oil resources remain in the ground based on current field plans.

Webinar: Discuss increased oil recovery with the finalists

On Tuesday 29 September the NPD will arrange an event with all three finalists. Join us and discuss their future work and how their methods can be applied at other fields on the Norwegian continental shelf. More information to come.

More about the winner and the finalists

The researcher Geir Evensen

The Grane field in the North Sea

The oil company Lundin

Two women talking, two men working in the back.Ingrid Sølvberg in conversation with Anne Blomberg from ONS in connection with the presentation of the IOR award 2020. 

Watch a video with winner Geir Evensen:

 

Updated: 01/09/2020

Latest news

Production figures June 2024
23/07/2024 Preliminary production figures for June 2024 show an average daily production of 1 982 000 barrels of oil, NGL and condensate.
Join us for an exploration seminar
16/07/2024 We look forward to welcoming you to a seminar on the topic of exploration in the Barents Sea, to be held on 23-24 October 2024 at our offices in Stavanger. The seminar will include presentations by the Ministry of Energy, the Norwegian Offshore Directorate, licensees and suppliers.
Drilling permit for wellbore 6610/7-3
11/07/2024 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 6610/7-3 in production licence 1014, cf. Section 13 of the Resource Management Regulations.
Delineation of discovery in the North Sea (35/10-12 S)
10/07/2024 Wellesley Petroleum has proven oil and gas in the Gnomoria Appraisal (35/10-12 S) well in the North Sea, about 100 kilometres southwest of Florø.
Drilling permit for wellbore 35/6-5 S
04/07/2024 The Norwegian Offshore Directorate has granted Aker BP ASA drilling permit for wellbore 35/6-5 S in production licence 1110, cf. Section 13 of the Resource Management Regulations.
Drilling permit for wellbore 31/1-4
03/07/2024 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 31/1-4 in production licence 923 B, cf. Section 13 of the Resource Management Regulations.
The Norwegian shelf is continuously developing
28/06/2024 Director General Torgeir Stordal shares his thoughts on the trends in activity on the Norwegian Continental Shelf (NCS) in the first half of 2024.
Gas discovery in the Barents Sea (7324/8-4)
28/06/2024 Aker BP and its partners have discovered gas in wildcat well 7324/8-4 (Hassel) in the Barents Sea, around 300 kilometres from the northern coast of Norway.
Found oil and gas in the North Sea (36/7-5 S, A, B and C)
27/06/2024 Vår Energi has made an oil and gas discovery in well 36/7-5 S “Cerisa” and sidetracks 36/7-5 A, B and C.
Nominated blocks for announcement on public consultation
26/06/2024 In connection with the first licensing round for mineral activities on the seabed, the Ministry of Energy has sent blocks nominated for announcement on a public consultation process.