Oljedirektoratet

Previous award winners

30/11/2017

2016 The licensees of the Åsgard field in the Norwegian Sea for their subsea wet gas compressor >>

2014

Martin Landrø for his work on developing 4D seismic for mapping, production management and monitoring of reservoirs >>
2012 Statoil for subsea work on the Oseberg field >>
2010 Professor Tor Austad of the University of Stavanger and the Corec research centre for their work on recovering more oil from chalk reservoirs >>
2009 FMC Technologies for having demonstrated the courage and determination to invest in technology which increases production from seabed wells >>
2008 No worthy candidate found (strong signal about lack of activity in implementing IOR/EOR) >>
2007 Talisman for courage and willingness to operate fields at tail end to prolong the production –specially mentioned Yme field redevelopment >>
2006 Halliburton and Baker for developing well technology needed in the Troll field >>
2005 Arne Skauge, Prof at UiB/CIPR, for his success to bring IOR research from laboratories to pilot testing and implementation in fields and for his educational skills >>
2004 Gullfaks license for project decisions and implementation ranging from advanced drilling into new reservoirs to new methods of produced water treatment >>
2003 BP for ”Life of Field Seismic” project in the Valhall field >>
2002 No worthy candidate found (strong signal about lack of activity in implementing IOR/EOR)
2001 Statoil and Egil Sunde for the use of bacteria, MEOR, in the Norne field
2000 Phillips Petroleum for making decisions on IOR/EOR projects in the Ekofisk field even when the oil price was low
1999 Saga for Foam assisted Water alternating Gas injection, FAWAG –pilot in the Snorre field
1998 Hydro for drilling of horizontal wells near the oil-water contact in the Troll field to produce more oil from the thin oil leg

Updated: 30/11/2017

Latest news

Who deserves the Improved Recovery Award?
22/02/2024 For the twentieth time, companies are invited to nominate candidates for what will now be known as the Improved Recovery Award.
Drilling permit for well 7220/2-2
21/02/2024 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for well 7220/2-2 in production licence 1080, cf. Section 13 of the Resource Management Regulations.
Production figures January 2024
20/02/2024 Preliminary production figures for January 2024 show an average daily production of 2 071 000 barrels of oil, NGL and condensate.
The Resource Accounts for last year have now been published
20/02/2024 The Resource Accounts for 2023 show an increase in the volume of reserves and contingent resources. The overall petroleum resources have been reduced somewhat.
Change in the Guidelines for the Measurement Regulations
19/02/2024 The Norwegian Offshore Directorate has published a new Appendix 4 to the Guidelines for the Measurement Regulations.
Dry well in the North Sea
16/02/2024 Exploration well 35/11-28 S "Harden sør" in the North Sea proved to be dry. Equinor Energy AS is the operator of production licence 248 C.
Dry wells in the North Sea
14/02/2024 Vår Energi drilled wells 25/7-12 S and A 200 kilometres northwest of Stavanger, both of which were dry.
Drilling permit for well 36/7-5 S
07/02/2024 The Norwegian Offshore Directorate has granted Neptune Energy Norge AS drilling permit for well 36/7-5 S in production licence 636, cf. Section 13 of the Resource Management Regulations.
Drilling permit for well 35/11-29 S
30/01/2024 The Norwegian Offshore Directorate has granted Wellesley Petroleum AS drilling permit for well 35/11-29 S in production licence 248 C, cf. Section 13 of the Resource Management Regulations.
The minerals we need
26/01/2024 Change is often difficult. This will also be true for the transition from fossil energy systems to renewables.