Sokkeldirektoratet

Dry well near the Norne field in the Norwegian Sea – 6608/11-9

8/5/2019 Capricorn Norge AS, operator of production licence 842, has completed the drilling of wildcat well 6608/11-9.

The well was drilled about 13 kilometres northeast of the Norne field and 200 kilometres west of Sandnessjøen.

The primary exploration target for the well was to prove petroleum in Upper Jurassic reservoir rocks (the Rogn formation). The secondary exploration target for the well was to examine reservoir development in Upper Jurassic reservoir rocks (intra Melke formation sandstones).

The Rogn formation was not present in the primary target. In the secondary target, 118 metres with alternating layers of clay stone, siltstone and sandstone was encountered in the Melke formation, where about 40 metres was sandstone with moderate reservoir quality.

There are no traces of petroleum in the well. The well is dry.

Data has been collected. This is the first exploration well in production licence 842. The licence was awarded in APA 2015.

Well 6608/11-9 was drilled to a vertical depth of 1676 metres below the sea surface, and was terminated in the Not formation in the Middle Jurassic.

Water depth at the site is 378 metres. The well will now be permanently plugged and abandoned.

Well 6608/11-9 was drilled by the Transocean Arctic drilling facility, which will now drill production wells on the Dvalin field in production licence 435 in the Norwegian Sea, where DEA Norge AS is the operator.

 

Map of well 6608-11-9

Contact
Bjørn Rasen

Tel: +47 51 87 60 00

Updated: 5/6/2022

Latest news

Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices. 
Seabed data from this summer’s cruise now available for order
9/26/2025 Orders can now be placed for data from this summer’s cruise in the Lofoten Basin (east of the Mohns Ridge) in the Norwegian Sea and the southwestern part of the Knipovich Ridge in the Greenland Sea.
Green light for export via gas pipeline from Troll B
9/25/2025 The Norwegian Offshore Directorate has granted consent for start-up of a tie-in from the Troll B platform to the Kvitebjørn gas export line.
Production figures August 2025
9/23/2025 Preliminary production figures for August 2025 show an average daily production of 2 124 000 barrels of oil, NGL and condensate.
Dry well in the North Sea (34/8-20 S)
9/19/2025 Equinor and its partners Vår Energi and Aker BP have drilled a dry well about 130 kilometres west of Florø.
Drilling permit for wellbore 34/4-19 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/4-19 S in production licence 057.
Drilling permit for wellbore 34/6-9 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/6-9 S in production licence 554.
Oil discovery in the North Sea (31/4-A-15 B)
9/11/2025 OKEA and its partners have made an oil discovery near the Brage field.