Sokkeldirektoratet

Diskos contracts signed

fotoEmileAshley5586x2_eric.jpg

Eric Toogood, project manager in Diskos.

3/26/2021 The contracts for Diskos 2.0, entered into with Landmark and Kadme, have been signed and implementation is under way.

“The contracts with Kadme and Landmark will provide us with solutions from reputable and highly competent suppliers. Current data volumes are in excess of 10 petabytes, and we expect growth of up to 2 petabytes per year in the coming years. Therefore, it is important that we have systems that can handle such huge volumes of data,” says project manager Eric Toogood in Diskos.

Diskos 2.0 consists of two modules:

  1. The database for subsurface data (seismic, well and production data). This has been awarded to Landmark.

  2. The trade module (application for data swap, managed by Norwegian Oil and Gas), which is where user rights to the data are established. This module has been awarded to Kadme.

The contracts have a duration of five years plus three optional years. The total estimated value is 157 million kroner.

Unique opportunity to share data

“The huge volumes of data in Diskos give the industry a unique opportunity to both share data and perform analyses that can provide more insight and accuracy in exploration for oil and gas.

Diskos 2.0 is being established as a scalable and flexible cloud service that gives users efficient access to seismic, well and production data,” says Maria Juul, head of the implementation effort.

Using open APIs, users can easily visualise and interpret data from the Diskos database using their own interpretation tools, eliminating the need to download the data first.

The IT architecture in the new solution also facilitates use of open industry standards such as the OSDU platform, and the use of digital tools such as machine learning and artificial intelligence to create added value from subsurface data.

The plan calls for launching Diskos 2.0 in summer 2022.

Contact:

Diskos project manager: Eric Toogood, +47 90576771

Diskos 2.0 implementation manager: Maria Juul, +47 48096592

 

Read more about Diskos and the contract awards.

 

Updated: 3/26/2021

Latest news

New report about power from shore
10/29/2025 Power from shore as replacement for gas turbines has been the most important abatement to reduce greenhouse gases emissions offshore.
Drilling permit for wellbore 7018/5-2
10/29/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7018/5-2 in production licence 1236.
Drilling permit for wellbore 25/8-C-23 D
10/24/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 25/8-C-23 D in production licence 027.
Production figures September 2025
10/21/2025 Preliminary production figures for September 2025 show an average daily production of 1 991 000 barrels of oil, NGL and condensate.
Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices. 
Seabed data from this summer’s cruise now available for order
9/26/2025 Orders can now be placed for data from this summer’s cruise in the Lofoten Basin (east of the Mohns Ridge) in the Norwegian Sea and the southwestern part of the Knipovich Ridge in the Greenland Sea.
Green light for export via gas pipeline from Troll B
9/25/2025 The Norwegian Offshore Directorate has granted consent for start-up of a tie-in from the Troll B platform to the Kvitebjørn gas export line.
Production figures August 2025
9/23/2025 Preliminary production figures for August 2025 show an average daily production of 2 124 000 barrels of oil, NGL and condensate.