Sokkeldirektoratet

Dry well northeast of the Norne field in the Norwegian Sea – 6608/6-1

8/20/2019 Aker BP ASA, operator of production licence 762, has concluded the drilling of wildcat well 6608/6-1.

The well was drilled about 65 kilometres northeast of the Norne field and 170 kilometres west of Sandnessjøen.

The objective of the well was to prove petroleum in reservoir rocks from the Permian Age.

Well 6608/6-1 encountered about 285 metres of carbonate rocks in the Zechstein group in the Permian. These are partially tight and partially with poor reservoir quality, but with four metres of moderate reservoir quality.

The well is dry. Extensive volumes of data have been collected.

This is the first exploration well in production licence 762, which was awarded in APA 2013.

Well 6608/6-1 was drilled to a vertical depth of 2724 metres below the sea surface, and was terminated in the Zechstein Group from the Permian Age. Water depth at the site is 288 metres. The well has now been permanently plugged and abandoned.

Well 6608/6-1 was drilled by the Deepsea Stavanger drilling facility, which has now started drilling of wildcat well 30/12-2 in production licence 986 in the North Sea, where Aker BP ASA is the operator.

Map of well 6608-6-1

Contact
postboks@sodir.no

Tel: +47 51 87 60 00

Updated: 2/10/2025

Latest news

Full house eager to learn at Technology Day
6/5/2026 The Norwegian Offshore Directorate is working to encourage the industry to develop, cooperate more closely and utilise new technology to an even greater extent. Tickets for this year's Technology Day were in high demand.
Drilling permit for wellbore 15/6-17
5/20/2026 The Norwegian Offshore Directorate has granted Aker BP ASA drilling permit for wellbore 15/6-17 in production licence 979.
Production figures April 2026
5/20/2026 Preliminary production figures for April 2026 show an average daily production of 2 158 000 barrels of oil, NGL and condensate.
Drilling permit for wellbore 34/10-56 S
5/8/2026 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/10-56 S in production licence 050 HS.
Announcement of awards in predefined areas (APA) 2026
5/5/2026 The Ministry of Energy announced APA 2026 on 5 May 2026, encompassing the predefined areas with blocks in the North Sea, Norwegian Sea and Barents Sea. 
The prospect form is updated
4/29/2026 The Norwegian Offshore Directorate has updated the prospect form for reporting prospects, leads and in some cases, discoveries.
Drilling permit for wellbore 7220/5-EC-2 H
4/27/2026 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7220/5-EC-2 H in production licence 532.
Dry well in the North Sea (34/8-A-37 H)
4/22/2026 Equinor and its partners have drilled a dry well in the “Skoll” and “Hati” prospects, east of the Visund field in the North Sea.
Production figures March 2026
4/21/2026 Preliminary production figures for March 2026 show an average daily production of 2 152 000 barrels of oil, NGL and condensate.
Advanced methods can curb production decline
4/15/2026 There is no time to waste if we want to extract more oil and gas from the Norwegian continental shelf (NCS) using advanced methods (EOGR). The benefits for our broader society could be enormous.