Sokkeldirektoratet

Dry well south of the Sleipner Øst field in the North Sea – 15/12-26

nyhetsbilder_od27.jpg

Illustration image.

5/18/2021 Chrysaor Norge AS, operator of production licence 973, has completed the drilling of wildcat well 15/12-26.

The well was drilled 26 kilometres south of the Sleipner Øst installation and 9 kilometres south of the Grevling discovery in the North Sea, about 240 kilometres west of Stavanger.

The objective of the well was to prove petroleum in reservoir rocks from the Late Jurassic (Ula Formation), and potentially underlying Late Triassic reservoir rocks (Skagerrak Formation).

The well encountered a sandstone layer of about 60 metres in the Ula Formation, with good to very good reservoir quality. The Skagerrak Formation was not encountered. The well is dry.

Data acquisition was carried out.

This is the second exploration well in production licence 973. The licence was awarded in APA 2018.

Well 15/12-26 was drilled to a vertical depth of 2,762 metres below sea level and was terminated in rocks from the Early Permian Age in the Zechstein group.

The water depth is 87 metres. The well will now be permanently plugged and abandoned.

Well 15/12-26 was drilled by the COSLInnovator drilling facility, which is now headed for Coast Center Base (CCB Ågotnes) west of Bergen for a temporary stay at the shipyard.

Map of well 15-12-26-T2

Contact

Ola Anders Skauby

Director Communication, public affairs and emergency response

Tel: +47 905 98 519

Updated: 5/18/2021

Latest news

Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices. 
Seabed data from this summer’s cruise now available for order
9/26/2025 Orders can now be placed for data from this summer’s cruise in the Lofoten Basin (east of the Mohns Ridge) in the Norwegian Sea and the southwestern part of the Knipovich Ridge in the Greenland Sea.
Green light for export via gas pipeline from Troll B
9/25/2025 The Norwegian Offshore Directorate has granted consent for start-up of a tie-in from the Troll B platform to the Kvitebjørn gas export line.
Production figures August 2025
9/23/2025 Preliminary production figures for August 2025 show an average daily production of 2 124 000 barrels of oil, NGL and condensate.
Dry well in the North Sea (34/8-20 S)
9/19/2025 Equinor and its partners Vår Energi and Aker BP have drilled a dry well about 130 kilometres west of Florø.
Drilling permit for wellbore 34/4-19 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/4-19 S in production licence 057.
Drilling permit for wellbore 34/6-9 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/6-9 S in production licence 554.
Oil discovery in the North Sea (31/4-A-15 B)
9/11/2025 OKEA and its partners have made an oil discovery near the Brage field.