Sokkeldirektoratet

Announcement of awards in predefined areas (APA) 2025

orn-formasjon-forsidebilde-tfo-2025

Thin section from the Ørn Formation, of Carboniferous and Permian age. The thin section is from a well drilled on the central Finnmark Platform in the Barents Sea and shows limestone with fossils from approximately 2000 meter depth. 

5/9/2025 The Ministry of Energy announced APA 2025 on 9 May 2025, encompassing the predefined areas with blocks in the Norwegian Sea, Norwegian Sea and Barents Sea.

The deadline to apply for APA 2025 is 12:00 noon on Tuesday, 2 September 2025.
Applicants are encouraged to submit in good time before the deadline.

Awards are expected during the first quarter of 2026. 

Read all you need to know about APA 2025

Contact

Ola Anders Skauby

Director Communication, security and emergency response

Tel: +47 905 98 519

Updated: 5/9/2025

Latest news

Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices. 
Seabed data from this summer’s cruise now available for order
9/26/2025 Orders can now be placed for data from this summer’s cruise in the Lofoten Basin (east of the Mohns Ridge) in the Norwegian Sea and the southwestern part of the Knipovich Ridge in the Greenland Sea.
Green light for export via gas pipeline from Troll B
9/25/2025 The Norwegian Offshore Directorate has granted consent for start-up of a tie-in from the Troll B platform to the Kvitebjørn gas export line.
Production figures August 2025
9/23/2025 Preliminary production figures for August 2025 show an average daily production of 2 124 000 barrels of oil, NGL and condensate.
Dry well in the North Sea (34/8-20 S)
9/19/2025 Equinor and its partners Vår Energi and Aker BP have drilled a dry well about 130 kilometres west of Florø.
Drilling permit for wellbore 34/4-19 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/4-19 S in production licence 057.
Drilling permit for wellbore 34/6-9 S
9/15/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 34/6-9 S in production licence 554.
Oil discovery in the North Sea (31/4-A-15 B)
9/11/2025 OKEA and its partners have made an oil discovery near the Brage field.