Sokkeldirektoratet

Dry well in the North Sea

SODIR_LETEBOR-1920x1080px.png

5/30/2024 Aker BP drilled the dry well 24/6-5 “Alvheim Deep” in the North Sea.

Production licence 203 was awarded in 1996, and this is the eleventh exploration well drilled in this production licence. The Noble Integrator rig was used to drill this well.

There is considerable activity in this part of the North Sea, for example a discovery made in 2023 (25/7-11 S “Norma”). In addition to Aker BP, ConocoPhillips and DNO also have active production licences in the area.

The rig will now drill sidetracks in the Kneler deposit, one of the six deposits in the Alvheim field in the North Sea where Aker BP is also the operator.

Geological info

The objective of the well was to prove petroleum in Upper Jurassic reservoir rocks in the Intra-Draupne Formation.

The well encountered the Draupne Formation, but no reservoir was present. The well is dry.

Well 24/6-5 was drilled to a vertical depth of 4626 metres below sea level, and was terminated in the Draupne Formation in the Upper Jurassic.

Water depth at the site is 120 metres.

Map showing the location of well 24/6-5

 

Contact

Ola Anders Skauby

Director Communication, public affairs and emergency response

Tel: +47 905 98 519

Updated: 5/30/2024

Latest news

New Dashboard: Resource stats by company
11/14/2025 Our new Dashboard provides an overview of the licensees’ respective petroleum resources and reserves on the Norwegian continental shelf (NCS).
Delineation of the “Zagato” oil discovery in the Barents Sea – 7122/8-4 S
11/13/2025 Vår Energi's appraisal well 7122/8-4 S confirms the 7122/8-3 S (“Zagato”) oil discovery, which was proven in February.
New technology is profitable when shutting down wells
11/13/2025 About 2900 wellbores on the Norwegian continental shelf (NCS) will be plugged and shut down in the years to come, but development and implementation of new technology can save the industry and society considerable costs.
Dry well in the North Sea (34/6-9 S)
11/11/2025 Equinor and its partners have drilled a dry well in the Snorre area in the North Sea.
Dry well in the North Sea (30/11-16 S)
11/7/2025 Aker BP and its partners have drilled a dry well in the Yggdrasil area in the North Sea.
Drilling permit for wellbore 7220/7-5
11/7/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7220/7-5 in production licence 532.
New CCS guidelines
11/3/2025 The Norwegian Offshore Directorate has drawn up guidelines explaining how to fulfil the requirements in Section 26 of the Regulations relating to documentation in connection with storage of CO2 on the Norwegian continental shelf.
New report about power from shore
10/29/2025 Power from shore as replacement for gas turbines has been the most important abatement to reduce greenhouse gases emissions offshore.
Drilling permit for wellbore 7018/5-2
10/29/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7018/5-2 in production licence 1236.
Drilling permit for wellbore 25/8-C-23 D
10/24/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 25/8-C-23 D in production licence 027.