Consultation – proposed amendments

9/20/2022 The Norwegian Petroleum Directorate (NPD) is presenting proposed amendments for a public hearing/consultation process.

This relates to the Resource Management Regulations and the Regulations relating to materials and documentation in connection with surveys for and utilisation of subsea reservoirs on the continental shelf to store CO₂.

The objective of the proposed changes is to adapt the regulations in relation to established practices and routines. We are also making necessary adjustments to the language, as well as certain simplifications and clarifications. Some material changes are also being proposed, these are described in detail in the consultation memo.

The NPD proposes that these amendments should take effect as of 1 January 2023.

The deadline for comments is 11 November 2022.

Consultation comments can be submitted to the NPD by email; postboks@npd.no.

Read more about the consultation.

Updated: 9/20/2022

Latest news

Renewed interest in exploring under the basalt
10/15/2026 Undiscovered oil and gas resources may be present under the volcanic rock basalt in the western part of the Norwegian Sea. However, no exploration wells have been drilled in these areas.
Oil and gas discovery in the North Sea (30/8-7 S)
10/14/2026 Equinor and its partners have discovered oil and gas in the “Grimsnes” prospect in the Oseberg area, about 140 km west of Bergen.
Production licences: We are transitioning to Altinn
10/13/2026 Starting on 21 October, applications and notifications on decisions associated with production licences must be submitted via Altinn. This will simplify the process for the companies.
Appraisal well in the North Sea increases projection (16/1-EA-4 H)
9/25/2026 Aker BP and its partners Equinor and DNO have drilled an appraisal well on the "Verdandi" and "Lillefix" discoveries in the North Sea. This well increases the projected discovery size.
Production figures August 2026
9/22/2026 Preliminary production figures for August 2026 show an average daily production of 2 073 000 barrels of oil, NGL and condensate.
Aker BP has made a gas discovery in the North Sea (36/4-2 and 36/4-2 A)
9/16/2026 Preliminary calculations show that the size is between 0.15 and 2.4 million standard cubic metres of recoverable oil equivalent (Sm3 of o.e.), which corresponds to 1-15 million barrels.
Drilling permit for wellbore 25/9-5 S
9/15/2026 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 25/9-5 S in production licence 1042.
Growing exploration interest
9/11/2026 The authorities have received applications from 21 companies in the Awards in Predefined Areas (APA) 2025. The deadline for applications was 1 September.
New NCS map 2026
9/8/2026 You can now download or order a printed version of the Directorate's most recent map of the Norwegian continental shelf (NCS).
Resource report 2026 in English
9/8/2026 The Resource report is now also available in English.