Sokkeldirektoratet

Guidelines for interpreted data

tianyi-ma-WiONHd_zYI4-unsplash-1920px.jpg

The guidelines were developed by the NPD in collaboration with the licensees on the Norwegian shelf. Photo: Tianyi Ma, Unsplash.

4/25/2022 The Norwegian Petroleum Directorate (NPD) has now prepared guidelines that clarify the term 'interpreted data'. The guidelines contain a definition of the term and describe what 'interpreted data' shall mean.

The term 'interpreted data' is not defined in the regulations. This is clarified in the guidelines through the following definition:

"Interpreted data shall mean products that are the result of a discretionary professional assessment, and which are of sufficient quality to form a basis for decisions in the production licence. Processed geophysical data, measured well data or depictions thereof are not considered to be interpreted data."

Important clarification

"It's been important to clarify the term 'interpreted data' and establish a precise definition. This helps ensure that data can be reported in an efficient and correct manner, and not least that more data can be available earlier," says Arne Jacobsen, the NPD's Assistant Director for Technology, Analysis and Coexistence.

These guidelines (see below) were developed by the NPD, on assignment from the Ministry of Petroleum and Energy (MPE) and in collaboration with the licensees on the Norwegian shelf.

"Over the past year, we've been in close dialogue with the industry in the form of work meetings, input and consultations. The NPD is pleased that we've achieved good cooperation," Jacobsen adds.

The duration of the confidentiality obligation is crucial

The licensees have a duty to report a wide range of data to the authorities pursuant to the petroleum regulations and the regulations relating to storage of CO2. Whether these reported data are interpreted or not interpreted, is crucial for the duration of the confidentiality obligation.

As regards interpreted data, the confidentiality obligation lasts 20 years, while for non-interpreted data, the obligation lasts for 2, 5 or 10 years, depending on certain conditions, counting from when the data became available to the data owner.

The Norwegian Petroleum Directorate has also submitted a recommendation to the MPE for a shortened confidentiality obligation for interpreted data.

Effect on reporting

The definition will have an impact on other guidelines; reporting well data (Blue Book) and reporting geophysical data (Yellow Book). The definition will apply both for data submitted to the authorities in the future and for the data already submitted. The NPD has initiated a process to review previously reported data.

As a result of the clarification and specified definition of the term, around 30 data types subject to mandatory reporting from the Blue Book will be reclassified from interpreted to non-interpreted data. The NPD will immediately update Table A1 from the Blue Book and future versions.

Applies both for data from petroleum and CO2 storage

This definition applies for petroleum-related data reported pursuant to the Petroleum Regulations and the Resource Management Regulations. It also applies for data associated with storage and transport of CO2 that is reported pursuant to the Regulations relating to storage and transport of CO2 on the shelf and the Regulations relating to documentation in connection with storing CO2 on the shelf.

More information

Guidelines for interpreted data (pdf) (Norwegian only)

All the NPD's guidelines

 

 

 

Contact

Ola Anders Skauby

Director Communication, public affairs and emergency response

Tel: +47 905 98 519

Updated: 4/25/2022

Latest news

Dry well in the North Sea (30/11-16 S)
11/7/2025 Aker BP and its partners have drilled a dry well in the Yggdrasil area in the North Sea.
Drilling permit for wellbore 7220/7-5
11/7/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7220/7-5 in production licence 532.
New CCS guidelines
11/3/2025 The Norwegian Offshore Directorate has drawn up guidelines explaining how to fulfil the requirements in Section 26 of the Regulations relating to documentation in connection with storage of CO2 on the Norwegian continental shelf.
New report about power from shore
10/29/2025 Power from shore as replacement for gas turbines has been the most important abatement to reduce greenhouse gases emissions offshore.
Drilling permit for wellbore 7018/5-2
10/29/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7018/5-2 in production licence 1236.
Drilling permit for wellbore 25/8-C-23 D
10/24/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 25/8-C-23 D in production licence 027.
Production figures September 2025
10/21/2025 Preliminary production figures for September 2025 show an average daily production of 1 991 000 barrels of oil, NGL and condensate.
Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices.