Sokkeldirektoratet

Change in the Guidelines for the Measurement Regulations

paragraf-blå.jpg

2/19/2024 The Norwegian Offshore Directorate has published a new Appendix 4 to the Guidelines for the Measurement Regulations.


The Norwegian Offshore Directorate has published a new Appendix 4 to the Guidelines for the Measurement Regulations. This Appendix is a spreadsheet that can be used to submit an uncertainty budget for CO2 tax measurements to the Norwegian Offshore Directorate pursuant to Section 96 of the Measurement Regulations. The spreadsheet has been prepared in collaboration with the industry. An uncertainty budget for CO2 tax measurements must be submitted to the Norwegian Offshore Directorate on an annual basis by 1 March of the following year.

The Guidelines with appendices have been translated into English, with the exception of Appendix 4, which only exists in Norwegian.

The Norwegian version of the Guidelines for the Measurement Regulations with appendices can be found at Veiledninger - Sokkeldirektoratet (sodir.no):

An English translation of the guidelines and appendices can be found at Guidelines - The Norwegian Offshore Directorate (sodir.no/en):

Guidelines
Appendix 1
Appendix 2
Appendix 3
Appendix 4

Contact
postboks@sodir.no

Tel: +47 51 87 60 00

Updated: 2/19/2024

Latest news

Drilling permit for wellbore 7018/5-2
10/29/2025 The Norwegian Offshore Directorate has granted Equinor Energy AS drilling permit for wellbore 7018/5-2 in production licence 1236.
Drilling permit for wellbore 25/8-C-23 D
10/24/2025 The Norwegian Offshore Directorate has granted Vår Energi ASA drilling permit for wellbore 25/8-C-23 D in production licence 027.
Production figures September 2025
10/21/2025 Preliminary production figures for September 2025 show an average daily production of 1 991 000 barrels of oil, NGL and condensate.
Public consultation – proposed changes to two regulations
10/2/2025 The Norwegian Offshore Directorate is submitting proposed changes to the Resource Management Regulations and the Regulations relating to documentation in connection with storage of CO2 on the shelf for public consultation.
Drilling permit for wellbore 35/8-8 S
10/2/2025 The Norwegian Offshore Directorate has granted Harbour Energy Norge AS drilling permit for wellbore 35/8-8 S in production licence 248 LS og 248 B.
Popular tours of the Geobank during the Ulltra festival – celebrating the future
9/26/2025 At the end of September, the Norwegian Offshore Directorate participated in a brand-new festival at Ullandhaug - Ulltra 2025. Registered visitors had the opportunity to take part in a guided tour of the Geobank in our offices. 
Seabed data from this summer’s cruise now available for order
9/26/2025 Orders can now be placed for data from this summer’s cruise in the Lofoten Basin (east of the Mohns Ridge) in the Norwegian Sea and the southwestern part of the Knipovich Ridge in the Greenland Sea.
Green light for export via gas pipeline from Troll B
9/25/2025 The Norwegian Offshore Directorate has granted consent for start-up of a tie-in from the Troll B platform to the Kvitebjørn gas export line.
Production figures August 2025
9/23/2025 Preliminary production figures for August 2025 show an average daily production of 2 124 000 barrels of oil, NGL and condensate.
Dry well in the North Sea (34/8-20 S)
9/19/2025 Equinor and its partners Vår Energi and Aker BP have drilled a dry well about 130 kilometres west of Florø.